MISCELLANEOUS<br />
<strong>GENERAL</strong> <strong>NOTES</strong> <strong>AND</strong> <strong>CONSTRUCTION</strong> <strong>SPECIFICATIONS</strong><br />
VILLAGE OF GLENDALE HEIGHTS<br />
Revised 3/97<br />
1. ALL <strong>CONSTRUCTION</strong> WORK SHALL BE PERFORMED IN ACCORDANCE WITH<br />
THE ILLINOIS DEPARTMENT OF TRANSPORTATION "ST<strong>AND</strong>ARD<br />
<strong>SPECIFICATIONS</strong> FOR ROAD <strong>AND</strong> BRIDGE <strong>CONSTRUCTION</strong>" ADOPTED<br />
JANUARY 1, 1997 <strong>AND</strong> ALL SUBSEQUENT REVISIONS <strong>AND</strong> THE<br />
"<strong>SPECIFICATIONS</strong> FOR WATER <strong>AND</strong> SEWER <strong>CONSTRUCTION</strong> IN ILLINOIS",<br />
FIFTH EDITION DATED MAY 1996 <strong>AND</strong> ALL SUBSEQUENT REVISIONS, <strong>AND</strong><br />
THE VILLAGE CODE OF GLENDALE HEIGHTS. IN CASE OF CONFLICT THE<br />
VILLAGE CODE SHALL TAKE PRECEDENCE.<br />
2. CODES OF THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY TITLE 35,<br />
<strong>AND</strong> O.S.H.A. SHALL BE ADHERED TO FOR THE <strong>CONSTRUCTION</strong> OF THIS<br />
PROJECT.<br />
3. ALL REQUIRED PERMITS FROM THE PROPER GOVERNING AGENCY SHALL<br />
BE OBTAINED FOR <strong>CONSTRUCTION</strong> ALONG OR ACROSS EXISTING<br />
STREETS OR HIGHWAYS. THE CONTRACTOR SHALL MAKE<br />
ARRANGEMENTS FOR THE PROPER BRACING, SHEETING, SHORING <strong>AND</strong><br />
OTHER REQUIRED PROTECTION OF ALL ROADWAYS BEFORE<br />
<strong>CONSTRUCTION</strong> BEGINS. THE CONTRACTOR SHALL BE RESPONSIBLE<br />
FOR ANY DAMAGE TO THE STREETS OR ROADWAYS <strong>AND</strong> ASSOCIATED<br />
STRUCTURES <strong>AND</strong> SHALL MAKE REPAIRS AS NECESSARY TO THE<br />
SATISFACTION OF THE AGENCY, AT THE CONTRACTOR'S OWN EXPENSE.<br />
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION <strong>AND</strong><br />
MAINTENANCE OF ADEQUATE SIGNS <strong>AND</strong> WARNING DEVICES TO INFORM<br />
<strong>AND</strong> PROTECT THE PUBLIC.<br />
4. BOTH THE COMMUNITY DEVELOPMENT DEPARTMENT (CALL 260-6030) <strong>AND</strong><br />
PUBLIC SERVICES DEPARTMENT (CALL 260-6040) SHALL BE NOTIFIED 48<br />
HOURS PRIOR TO <strong>CONSTRUCTION</strong> OF VARIOUS PUBLIC IMPROVEMENTS.<br />
THIS INCLUDES ALL STREET <strong>AND</strong> DRAINAGE IMPROVEMENT<br />
<strong>CONSTRUCTION</strong> <strong>AND</strong>/OR TESTING WATER MAIN <strong>AND</strong> SANITARY SEWER<br />
IMPROVEMENT <strong>CONSTRUCTION</strong> <strong>AND</strong>/OR TESTING.<br />
5. ALL UTILITY COMPANIES (GAS, ELECTRIC, TELEPHONE, CABLE, ETC.) <strong>AND</strong><br />
THE VILLAGE SHALL BE NOTIFIED TO DETERMINE THE LOCATION OF<br />
UNDERGROUND UTILITIES PRIOR TO THE START OF <strong>CONSTRUCTION</strong> IN<br />
ORDER TO AVOID CONFLICTS. (PHONE J.U.L.I.E. AT: 1-800-892-0123).<br />
6. EASEMENTS FOR EXISTING UTILITIES, BOTH PUBLIC <strong>AND</strong> PRIVATE, <strong>AND</strong><br />
UTILITIES WITHIN PUBLIC RIGHTS-OF-WAY ARE SHOWN ON THE PLANS<br />
PREPARED BY THE PROJECT ENGINEER ACCORDING TO INFORMATION<br />
1
AVAILABLE FROM PUBLIC RECORDS. THE CONTRACTOR SHALL BE<br />
RESPONSIBLE FOR DETERMINING THE EXACT LOCATION IN THE FIELD OF<br />
THESE UTILITY LINES <strong>AND</strong> FOR THEIR PROTECTION FROM DAMAGE DUE<br />
TO <strong>CONSTRUCTION</strong> OPERATIONS. IF EXISTING UTILITY LINES OF ANY<br />
NATURE ARE ENCOUNTERED WHICH CONFLICT IN LOCATION WITH NEW<br />
<strong>CONSTRUCTION</strong>, THE CONTRACTOR SHALL NOTIFY THE PROJECT<br />
ENGINEER SO THAT THE CONFLICT MAY BE RESOLVED.<br />
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL<br />
PRIVATE <strong>AND</strong> PUBLIC UTILITIES EVEN THOUGH THEY MAY NOT BE SHOWN<br />
ON THE PLANS. ANY UTILITY THAT IS DAMAGED DURING <strong>CONSTRUCTION</strong><br />
SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE<br />
UTILITY OWNER BY THE CONTRACTOR.<br />
8. ALL UTILITY CONNECTIONS TO EXISTING LINES SHALL BE CONSTRUCTED<br />
IN ACCORDANCE WITH THE REGULATIONS <strong>AND</strong> TO THE SATISFACTION OF<br />
THE UTILITY OWNER.<br />
9. FIELD CHECK ALL DIMENSIONS, COORDINATES, <strong>AND</strong> ELEVATIONS BEFORE<br />
PROCEEDING WITH NEW WORK. NOTIFY THE PROJECT ENGINEER OF ANY<br />
DISCREPANCIES IMMEDIATELY.<br />
10. ALL PROPERTY MARKERS <strong>AND</strong> REFERENCE MARKERS SHALL BE<br />
CAREFULLY PRESERVED DURING <strong>CONSTRUCTION</strong> UNTIL THEIR LOCATION<br />
HAS BEEN WITNESSED OR OTHERWISE TIED IN BY AN AUTHORIZED<br />
AGENT OR SURVEYOR.<br />
11. THE SAFE <strong>AND</strong> ORDERLY PASSAGE OF TRAFFIC <strong>AND</strong> PEDESTRIANS SHALL<br />
BE PROVIDED WHERE OPERATIONS ABUT PUBLIC THROUGH-FARES <strong>AND</strong><br />
ADJACENT PROPERTY.<br />
12. ANY AREA OUTSIDE THE PROPERTY LINE USED BY THE <strong>GENERAL</strong> OR SUB-<br />
CONTRACTORS SHALL BE RETURNED TO THE STATE IT WAS FOUND<br />
PRIOR TO NEW <strong>CONSTRUCTION</strong>, EXCEPT WHERE NEW WORK IS SHOWN.<br />
13. ALL PUBLIC R.O.W. SHALL BE RESTORED WITH 4" TOP SOIL <strong>AND</strong> SODDING.<br />
14. WHEN CONNECTING TO AN EXISTING SEWER MAIN BY MEANS OTHER<br />
THAN AN EXISTING WYE, TEE, OR AN EXISTING MANHOLE, THE<br />
FOLLOWING METHOD SHALL BE USED:<br />
A. CIRCULAR SAW-CUT OF SEWER MAIN BY PROPER TOOLS<br />
("SHEWER-TAP": MACHINE OR SIMILAR) <strong>AND</strong> PROPER INSTALLATION<br />
OF HUB-WYE SADDLE OR HUB-TEE SADDLE.<br />
15. ALL FLOOR DRAINS SHALL BE CONNECTED TO THE SANITARY SEWER.<br />
ALL FOOTING DRAINS <strong>AND</strong> DOWNSPOUTS SHALL DISCHARGE ONTO THE<br />
GROUND OR INTO THE STORM SEWER SYSTEM.<br />
2
16. ALL SANITARY SEWERS, WATERMAINS <strong>AND</strong> STORM SEWERS MUST BE<br />
PLACED ON PROPERLY COMPACTED BEDDING. BEDDING MATERIAL<br />
SHALL BE PLACED A MINIMUM OF 4 INCHES THICK UNDER THE BARREL OF<br />
THE PIPE <strong>AND</strong> FOR PVC PIPE MATERIAL SHALL BE EXTENDED 6" OVER THE<br />
TOP OF PIPE. BEDDING MATERIAL SHALL BE CRUSHED GRAVEL OR<br />
STONE MEETING GRADATION CA-6.<br />
17. TRENCH BACKFILL MATERIAL (CA-6 CRUSHED STONE) SHALL BE PLACED<br />
TO EITHER THE SPRINGLINE OF THE PIPE OR HALF THE DIAMETER OF THE<br />
PIPE <strong>AND</strong> COMPACTED TO A MINIMUM OF 95% MODIFIED PROCTOR<br />
DENSITY (A.S.T.M. D-1557) OVER ALL UNDERGROUND UTILITIES WHICH<br />
ARE CONSTRUCTED UNDER, OR WITHIN 2 FEET OF, ANY PROPOSED OR<br />
EXISTING PAVEMENT, PARKING LOTS, SIDEWALKS, CURB, OR OTHER<br />
STRUCTURE.<br />
18. NO BURNING OR INCINERATION OF RUBBISH WILL BE PERMITTED ON SITE.<br />
19. PROPOSED ELEVATIONS INDICATE FINISHED CONDITIONS. FOR ROUGH<br />
GRADING ELEVATIONS ALLOW FOR THICKNESS OF PROPOSED PAVING<br />
(ROADS, WALKS, DRIVE, ETC.) OR TOPSOIL AS SHOWN.<br />
20. PROVIDE SMOOTH VERTICAL CURVES THROUGH HIGH <strong>AND</strong> LOW POINTS<br />
AS INDICATED BY SPOT ELEVATIONS. PROVIDE UNIFORM SLOPES<br />
BETWEEN NEW <strong>AND</strong> EXISTING GRADES. AVOID RIDGES <strong>AND</strong><br />
DEPRESSIONS.<br />
21. ALL TOP OF FRAMES FOR STORM <strong>AND</strong> SANITARY SEWERS <strong>AND</strong> VALVE<br />
VAULT COVERS ARE TO BE ADJUSTED TO MEET FINAL FINISH GRADE.<br />
22. BEFORE INITIAL ACCEPTANCE BY THE OWNER/VILLAGE, ALL WORK SHALL<br />
BE INSPECTED <strong>AND</strong> APPROVED BY THE OWNER <strong>AND</strong> VILLAGE OR HIS<br />
REPRESENTATIVES. THE CONTRACTOR SHALL GUARANTEE HIS WORK<br />
FOR A PERIOD OF ONE YEAR FROM THE DATE OF INITIAL ACCEPTANCE<br />
<strong>AND</strong> SHALL BE HELD RESPONSIBLE FOR ANY DEFECTS IN MATERIAL OR<br />
WORKMANSHIP OF THIS WORK DURING THAT PERIOD <strong>AND</strong> UNTIL FINAL<br />
ACCEPTANCE IS MADE.<br />
23. ALL MATERIAL SHALL BE NEW WITH PRODUCTION DATES NOT MORE THAN<br />
ONE YEAR OLD AT INSTALLATION DATE.<br />
IEPA WATER MAIN PROTECTION<br />
(FROM STATE OF ILLINOIS RULES <strong>AND</strong> REGULATIONS TITLE 35)<br />
WATER MAINS:<br />
1. HORIZONTAL SEPARATION:<br />
3
A) WATER MAINS SHALL BE LAID AT LEAST TEN FEET HORIZONTALLY<br />
FROM ANY EXISTING OR PROPOSED DRAIN, STORM SEWER,<br />
SANITARY SEWER OR SEWER SERVICES CONNECTION.<br />
B) WATER MAINS MAY BE LAID CLOSER THAN TEN FEET TO A SEWER<br />
LINE WHEN:<br />
1) LOCAL CONDITIONS PREVENT A LATERAL SEPARATION OF<br />
TEN FEET;<br />
2.) THE WATER MAIN INVERT IS AT LEAST 18 INCHES ABOVE THE<br />
CROWN OF THE SEWER; <strong>AND</strong><br />
3.) THE WATER MAIN IS EITHER IN A SEPARATE TRENCH OR IN<br />
THE SAME TRENCH ON AN UNDISTURBED EARTH SHELF<br />
LOCATED TO ONE SIDE OF THE SEWER.<br />
C) BOTH THE WATER MAIN <strong>AND</strong> DRAIN OR SEWER SHALL BE<br />
CONSTRUCTED OF SLIP-ON OR MECHANICAL JOINT DUCTILE IRON<br />
PIPE, PRESTRESSED CONCRETE PIPE, OR PVC PIPE MEETING THE<br />
REQUIREMENTS OF SECTION 653.111 WHEN IT IS IMPOSSIBLE TO<br />
MEET (A) OR (B) ABOVE. THE DRAIN OR SEWER SHALL BE<br />
PRESSURE TESTED TO THE MAXIMUM EXPECTED SURCHARGE<br />
HEAD BEFORE BACKFILLING.<br />
2. VERTICAL SEPARATION:<br />
A) A WATER MAIN SHALL BE LAID SO THAT ITS INVERT IS 18 INCHES<br />
ABOVE THE CROWN OF THE DRAIN OR SEWER WHENEVER WATER<br />
MAINS CROSS STORM SEWERS, SANITARY SEWERS OR SEWER<br />
SERVICE CONNECTIONS. THE VERTICAL SEPARATION SHALL BE<br />
MAINTAINED FOR THAT PORTION OF THE WATER MAIN LOCATED<br />
WITHIN TEN FEET HORIZONTALLY OF ANY SEWER OR DRAIN<br />
CROSSED. A LENGTH OF WATER MAIN PIPE SHALL BE CENTERED<br />
OVER THE SEWER TO BE CROSSED WITH JOINTS EQUIDISTANCE<br />
FROM THE SEWER OR DRAIN.<br />
B) BOTH THE WATER MAIN <strong>AND</strong> SEWER SHALL BE CONSTRUCTED OF<br />
SLIP-ON OR MECHANICAL JOINT DUCTILE IRON PIPE, PRESTRESSED<br />
CONCRETE PIPE, OR PVC PIPE MEETING REQUIREMENTS OF<br />
SECTION 653.111 WHEN:<br />
1) IT IS IMPOSSIBLE TO OBTAIN THE PROPER VERTICAL<br />
SEPARATION AS DESCRIBED IN (A) ABOVE; OR<br />
2) THE WATER MAIN PASSES UNDER A SEWER OR DRAIN.<br />
C) A VERTICAL SEPARATION OF 18 INCHES BETWEEN THE INVERT OF<br />
THE SEWER OR DRAIN <strong>AND</strong> THE CROWN OF THE WATER MAIN<br />
SHALL BE MAINTAINED WHERE A WATER MAIN CROSSES UNDER A<br />
4
SEWER. SUPPORT THE SEWER OR DRAIN LINES TO PREVENT<br />
SETTLING <strong>AND</strong> BREAKING THE WATER MAIN.<br />
D) <strong>CONSTRUCTION</strong> SHALL EXTEND ON EACH SIDE OF THE CROSSING<br />
UNTIL THE NORMAL DISTANCE FROM THE WATER MAIN TO THE<br />
SEWER OR DRAIN LINE IS AT LEAST TEN FEET.<br />
WATERMAIN <strong>CONSTRUCTION</strong><br />
1. ALL WATERMAIN <strong>CONSTRUCTION</strong> SHALL BE IN ACCORDANCE WITH THE<br />
ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> FOR WATER <strong>AND</strong> SEWER MAIN<br />
<strong>CONSTRUCTION</strong> IN ILLINOIS, FIFTH EDITION, DATED MAY, 1996 <strong>AND</strong><br />
REVISIONS THERETO, THE SPECIAL PROVISIONS, THE <strong>NOTES</strong> IN THE<br />
PLANS, <strong>AND</strong> IN ACCORDANCE WITH CODES <strong>AND</strong> ORDINANCES OF THE<br />
GOVERNING AUTHORITIES. IN CASE OF CONFLICT, VILLAGE CODE SHALL<br />
GOVERN.<br />
2. WATER MAINS: WATER MAIN SHALL BE LAID IN ACCORDANCE WITH<br />
DIVISION IV, SECTION 41 OF THE "ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong>". SURPLUS<br />
EXCAVATED MATERIALS FROM THE TRENCH WILL BE DISPOSED OF BY<br />
THE CONTRACTOR. PIPE WILL BE LAID WITH A MINIMUM <strong>AND</strong> MAXIMUM<br />
COVER OF FIVE <strong>AND</strong> ONE-HALF (5 1/2) FEET FROM THE PROPOSED FINISH<br />
GRADE INDICATED ON THE PLANS OR TO THE SPECIFIC GRADE INDICATED<br />
ON THE PLANS FOR THE WATER MAIN. NO BERMS ALLOWED OVER<br />
WATERMAINS. A TIGHT PLUG SHALL BE PLACED IN THE END OF THE PIPE<br />
AT THE END OF EACH <strong>CONSTRUCTION</strong> DAY.<br />
3. PIPE SHALL BE DUCTILE IRON, CLASS 52, CONFORMING TO THE<br />
REQUIREMENTS OF DIVISION IV, SECTION 40-2.02 OF THE "ST<strong>AND</strong>ARD<br />
<strong>SPECIFICATIONS</strong>", CENTRIFUGALLY CAST WITH STD. THICKNESS CEMENT<br />
LINING (AWWA STD.112). JOINTS WILL COMPLY WITH THE PROVISIONS OF<br />
DIVISION IV, SECTION 41-2.05B OR SECTION 41-2.05C OF THE "ST<strong>AND</strong>ARD<br />
<strong>SPECIFICATIONS</strong>". ALL FITTINGS MUST EMPLOY AMERICAN MADE DUCTILE<br />
IRON RETAINER GL<strong>AND</strong>S OR CAST-IN-PLACE P.C.C. THRUST BLOCKING.<br />
NO FOREIGN MATERIAL WILL BE ALLOWED.<br />
4. THRUST BLOCKING SHALL CONFORM TO THE REQUIREMENTS OF<br />
SECTION 41-2.09 OF THE "ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong>".<br />
5. FIRE HYDRANTS: THIS WORK SHALL BE IN ACCORDANCE WITH THE<br />
APPLICABLE PORTIONS OF DIVISION IV, SECTION 45 OF THE "ST<strong>AND</strong>ARD<br />
<strong>SPECIFICATIONS</strong>". ALL FIRE HYDRANTS SHALL BE MUELLER CENTURION,<br />
OR KENNEDY GUARDIAN 5 1/4" VALVE OPENING WITH NATIONAL<br />
ST<strong>AND</strong>ARD THREADS WITH 4 1/2" PORT <strong>AND</strong> 2 1/2" PORTS <strong>AND</strong> WITH<br />
BREAKAWAY TRAFFIC FLANGES <strong>AND</strong> SHALL BE DESIGNED FOR A MINIMUM<br />
OF FIVE <strong>AND</strong> ONE-HALF (5 1/2) FEET OF COVER. THE BASE ELBOW OF THE<br />
HYDRANT SHALL BE PROPERLY THRUST BLOCKED <strong>AND</strong> SHALL BE<br />
5
PROVIDED WITH CLEAN WASHED STONE <strong>AND</strong> A POLYETHYLENE<br />
COVERING.<br />
6. ALL FIRE HYDRANTS SHALL BE FURNISHED <strong>AND</strong> INSTALLED COMPLETE<br />
WITH A SIX (6) INCH AUXILIARY VALVE <strong>AND</strong> CAST IRON VALVE BOX.<br />
VALVES SHALL BE RESILIENT VALVE BOXES SHALL BE CLOW F-2454 WITH<br />
CLOW F-2495 COVERS OR APPROVED EQUAL. FIRE HYDRANTS TO BE<br />
PAINTED “SAFETY” YELLOW.<br />
WATER SERVICES <strong>AND</strong> SERVICE CONNECTIONS:<br />
1. ALL FITTINGS SHALL BE AS MANUFACTURED BY THE MUELLER COMPANY,<br />
DECATUR, ILLINOIS, CONFORMING WITH THE FOLLOWING:<br />
6<br />
NUMBER<br />
CORPORATION STOP H-15000<br />
CURB STOP (MINNESOTA TOP) H-15154<br />
CURB BOX (BUFFALO TYPE) 100-F H-10302<br />
2. SERVICE BOX SHALL BE OF SUFFICIENT LENGTH TO PERMIT THE TOP TO<br />
BE INSTALLED APPROXIMATELY 3" ABOVE FINISH GRADE. EACH SERVICE<br />
BOX SHALL BE PROVIDED WITH A CAP WITH THE WORD "WATER" CAST IN<br />
THE TOP. B. BOX TO BE INSTALLED AT THE RIGHT OF WAY (R.O.W).<br />
3. DIMENSIONALLY TIE IN THE ENDS OF ALL SERVICES BY MEASUREMENTS<br />
TO LOT CORNERS <strong>AND</strong> FURNISH A COPY OF SUCH TIE-INS TO THE<br />
PROJECT ENGINEER FOR THE PREPARATION OF RECORD "AS-BUILT"<br />
DRAWINGS.<br />
4. MARK AT THE LOCATION OF ALL SERVICE BOXES INSTALLED A 2" X 4"<br />
WOOD POST AT LEAST SIX (6) FEET IN LENGTH. THE POST SHALL BE<br />
BURIED NEXT TO THE SERVICE BOX WITH APPROXIMATELY THREE (3)<br />
FEET OF ITS LENGTH EXPOSED. THE EXPOSED PORTION OF THE STAKE<br />
SHALL BE PAINTED BLUE.<br />
5. FURNISH <strong>AND</strong> INSTALL GRANULAR TRENCH BACKFILL IN ACCORDANCE<br />
WITH THE ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> <strong>AND</strong> THE IMPROVEMENT PLANS AT<br />
ALL LOCATIONS WHERE TRENCHES FOR WATER SERVICE LINES ARE<br />
WITHIN AREAS TO BE PAVED.<br />
6. VALVES <strong>AND</strong> VALVE BOXES OR VAULTS: THIS WORK SHALL BE IN<br />
ACCORDANCE WITH DIVISION IV, SECTION 42 OF THE "ST<strong>AND</strong>ARD<br />
<strong>SPECIFICATIONS</strong>".<br />
7. VALVES SHALL CONFORM TO THE ST<strong>AND</strong>ARDS OF THE LATEST AWWA<br />
C500, <strong>AND</strong> SHALL HAVE MECHANICAL JOINT ENDS. VALVES SHALL BE
RESILIENT. TAPPING SLEEVES SHALL BE ALL STAINLESS STEEL WITH A<br />
STAINLESS STEEL FLANGE OR ALL DUCTILE IRON.<br />
8. ALL VALVES UNDER 10" DIAMETER SHALL BE INSTALLED IN VALVE VAULTS<br />
HAVING A MINIMUM DIAMETER OF FOUR (4) FEET BELOW THE<br />
CONCENTRIC CONE SECTION. THE VAULTS SHALL BE CONSTRUCTED OF<br />
PRECAST CONCRETE RINGS <strong>AND</strong> SHALL CONFORM TO DETAILS IN PLANS<br />
TOGETHER WITH THE MODIFICATIONS SPECIFIED, AS INDICATED ON THE<br />
DETAIL IN THE PLANS. ALL VALVE VAULTS SHALL BE LEAK PROOF. ALL<br />
VALVES 10" DIAMETER <strong>AND</strong> LARGER SHALL BE IN A FIVE (5) FOOT<br />
DIAMETER VALVE VAULT.<br />
9. MANHOLE STEPS IN THE VALVE VAULTS WILL BE REQUIRED.<br />
10. PRECAST CONCRETE ADJUSTING RINGS ARE NOT TO EXCEED 12" INCHES<br />
IN OVERALL HEIGHT <strong>AND</strong> SHALL BE USED IF AN ADJUSTMENT TO THE<br />
FINISHED GRADE ESTABLISHED BY THE PROJECT ENGINEER IS<br />
NECESSARY.<br />
11. TESTING FOR ACCEPTANCE OF WATER MAIN: REQUIRED TESTS - WATER<br />
MAINS SHALL BE TESTED FOR ACCEPTABILITY BY CONDUCTING A<br />
HYDROSTATIC PRESSURE TEST <strong>AND</strong> A BACTERIOLOGICAL TEST IN<br />
ACCORDANCE WITH THE "ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong>" <strong>AND</strong> THE<br />
REQUIREMENTS OF THE VILLAGE.<br />
12. ALL TEMPORARY CONNECTIONS FOR <strong>CONSTRUCTION</strong> PURPOSES TO<br />
NEWLY INSTALLED OR EXISTING WATER MAINS SHALL BE MADE <strong>AND</strong><br />
METERED IN ACCORDANCE WITH GLENDALE HEIGHTS PUBLIC WORKS<br />
DEPARTMENT REQUIREMENTS.<br />
13. ALL WATERMAIN MUST BE POLY-WRAPPED.<br />
SANITARY SEWER <strong>CONSTRUCTION</strong><br />
1. ALL SANITARY SEWER <strong>CONSTRUCTION</strong> SHALL BE IN ACCORDANCE WITH<br />
THE ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> FOR WATER <strong>AND</strong> SEWER MAIN<br />
<strong>CONSTRUCTION</strong> IN ILLINOIS, FIFTH EDITION, DATED MAY, 1996, <strong>AND</strong><br />
REVISIONS THERETO, THE SPECIAL PROVISIONS, THE <strong>NOTES</strong> IN THE<br />
PLANS, <strong>AND</strong> IN ACCORDANCE WITH CODES <strong>AND</strong> ORDINANCES OF THE<br />
GOVERNING AUTHORITIES. IN CASE OF CONFLICT, VILLAGE CODE SHALL<br />
GOVERN.<br />
2. ALL TRENCHES RESULTING FROM THE <strong>CONSTRUCTION</strong> OF WATERMAIN<br />
<strong>AND</strong> SEWER <strong>AND</strong> SERVICE PIPE SHALL BE BACKFILLED WITH COMPACTED<br />
TRENCH BACKFILL ACCORDING TO THE ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> FOR<br />
WATER <strong>AND</strong> SEWER MAIN <strong>CONSTRUCTION</strong> IN ILLINOIS.<br />
7
3. SEWER <strong>CONSTRUCTION</strong> - PIPE SEWERS: ALL WORK SHALL CONFORM TO<br />
THE PROVISIONS OF THE ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> EXCEPT AS SAME<br />
MAY BE MODIFIED BY THE FOLLOWING: <strong>CONSTRUCTION</strong> SHALL<br />
COMMENCE AT THE EXISTING MANHOLES AS SHOWN ON THE PLANS. A<br />
TIGHT PLUG SHALL BE PLACED <strong>AND</strong> LEFT IN PLACE AT THE POINT OF<br />
COMMENCEMENT UNTIL THE BALANCE OF THE SEWERS HAVE BEEN<br />
COMPLETED <strong>AND</strong> CHECKED <strong>AND</strong> ARE READY FOR ACCEPTANCE. ALL<br />
WATER FROM THE TRENCH <strong>AND</strong> PIPELINES ABOVE THE MANHOLES WILL<br />
BE PUMPED OUT BY THE CONTRACTOR <strong>AND</strong> DISPOSED OF IN SUCH A<br />
MANNER THAT IT WILL NOT INTERFERE OR DAMAGE THE WORK OF THIS<br />
OR OTHER CONTRACTORS. PUMPING SHALL BE CONTINUOUS (24 HOURS<br />
A DAY, SEVEN DAYS A WEEK) AS LONG AS SUFFICIENT WATER COLLECTS<br />
TO WARRANT THIS. STORM SEWERS IN THE AREA MAY BE USED TO<br />
DISPOSE OF THE WATER COLLECTED, IF APPROVED BY THE VILLAGE.<br />
4. BEFORE BACKFILLING LATERAL TRENCHES A GREEN TIPPED 2" X 4" POST<br />
WILL BE SET AT THE UPPER END OF EACH LATERAL EXTENDING FROM<br />
THE BOTTOM OF THE TRENCH TO A POINT THREE (3) FEET ABOVE THE<br />
GROUND SURFACE. IN ADDITION, THE CONTRACTOR IS REQUIRED TO<br />
RECORD THE LOCATION OF ALL TEES OR WYES IN THE MAIN SEWER <strong>AND</strong><br />
FURNISH THE PROJECT ENGINEER THIS INFORMATION. THE<br />
CONTRACTOR SHALL LOCATE THE ENDS OF ALL SERVICES BY<br />
MEASUREMENTS TO LOT CORNERS <strong>AND</strong> SHALL FURNISH A COPY OF<br />
SUCH LOCATIONS TO THE PROJECT ENGINEER. THIS INFORMATION<br />
SHALL ALSO INCLUDE THE DEPTH OF THE ENDS OF EACH SERVICE. IF<br />
THE CONTRACTOR FAILS TO PROPERLY LOCATE ANY SEWER STUB, HE<br />
SHALL BE RESPONSIBLE FOR ALL COSTS WHICH ARE INCURRED AS A<br />
RESULT OF THE IMPROPERLY LOCATED STUB.<br />
5. ALL SANITARY SEWER PIPE SHALL BE PVC PIPE CONFORMING TO ASTM<br />
DESIGNATION D-3034-73 SDR 26 OR AN APPROVED EQUAL. ALL PVC PIPE<br />
SHALL BE FURNISHED WITH FACTORY MANUFACTURED JOINTS UTILIZING<br />
A RUBBER RING LOCKED IN THE BELL OF THE PIPE. ALL PVC PIPE IN<br />
CLOSE PROXIMITY TO A WATERMAIN SHALL BE PRESSURE PIPE.<br />
6. GRANULAR TRENCH BACKFILL FOR SERVICE LINES: THE CONTRACTOR<br />
SHALL FURNISH <strong>AND</strong> INSTALL GRANULAR TRENCH BACKFILL IN<br />
ACCORDANCE WITH THE ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> <strong>AND</strong> THE<br />
IMPROVEMENT PLANS AT ALL LOCATIONS WHERE TRENCHES FOR<br />
SANITARY SEWER LINES ARE WITHIN AREAS TO BE PAVED.<br />
7. SANITARY SEWER SERVICES SHALL BE CONSTRUCTED ACCORDING TO<br />
THE DETAILS IN THE PLANS, <strong>AND</strong> THE EXACT LOCATION OF EACH SHALL<br />
BE DETERMINED IN THE FIELD. THE CONTRACTOR SHALL FURNISH AS-<br />
BUILT DRAWINGS OF SANITARY SEWER SERVICES AT THE COMPLETION<br />
OF <strong>CONSTRUCTION</strong>.<br />
8
8. SANITARY SEWER SERVICE PIPE SHALL BE CONNECTED TO SANITARY<br />
SEWER MAIN BY WYE CONNECTIONS IN ALL INSTANCES.<br />
9. MANHOLES FOR SANITARY SEWERS: PRECAST CONCRETE MANHOLES<br />
SHALL BE PROVIDED FOR THIS IMPROVEMENT, CONFORMING TO THE<br />
APPLICABLE PORTIONS OF DIVISION III, SECTION 32 OF THE ST<strong>AND</strong>ARD<br />
<strong>SPECIFICATIONS</strong> <strong>AND</strong> THE DETAILS IN THE PLANS. IN ADDITION, A<br />
FLEXIBLE TYPE JOINT SHALL BE FURNISHED AT POINTS OF ENTRY INTO<br />
<strong>AND</strong> EXIT FROM MANHOLE STRUCTURES OF DESIGN APPROVED BY THE<br />
ENGINEER PRIOR TO INSTALLATION. THIS FLEXIBLE JOINT MAY CONSIST<br />
OF A SLEEVE OF HIGH QUALITY SYNTHETIC RUBBER WITH A SUBSTANTIAL<br />
SERRATED FLANGE WHICH IS CAST DIRECTLY INTO THE WALL OF THE<br />
MANHOLE BASE TO FORM A TIGHT WATERSTOP <strong>AND</strong> PROTRUDES<br />
OUTSIDE OF THE MANHOLE WALL TO CONNECT WITH THE PIPE<br />
ENTERING/EXITING THE MANHOLE. WHEN THIS TYPE OF FLEXIBLE JOINT<br />
IS USED, THE SLEEVE SHALL SLIP OVER THE END OF THE PIPE ADJACENT<br />
TO THE MANHOLE BASE <strong>AND</strong> SHALL BE SECURED BY MEANS OF A<br />
STAINLESS STEEL STRAP CLAMP EQUIPPED WITH A DRAW BOLT <strong>AND</strong> NUT.<br />
SANITARY MANHOLE OUTSIDE SURFACES TO BE DOUBLE COATED WITH<br />
BITUMINOUS PAINT.<br />
10. ALL ADJUSTMENTS NECESSARY SHALL BE MADE WITH PRECAST<br />
CONCRETE ADJUSTING RINGS NOT TO EXCEED A MAXIMUM OF TWELVE<br />
(12) INCHES OVERALL IN HEIGHT. BUTYLROPE JOINT SEALANT SHALL BE<br />
USED ON ALL JOINTS BETWEEN THE PRECAST ELEMENTS.<br />
11. AFTER FINAL ADJUSTMENTS HAVE BEEN MADE, ALL JOINTS IN PRE-CAST<br />
STRUCTURES SHALL BE MORTARED. THE MORTAR SHALL BE COMPOSED<br />
OF ONE PART CEMENT TO (3) PARTS S<strong>AND</strong>, BY VOLUME, BASED ON DRY<br />
MATERIALS <strong>AND</strong> SHALL BE THOROUGHLY WETTED BEFORE LAYING.<br />
12. SANITARY SEWER MANHOLES SHALL BE 4' IN DIAMETER UNLESS<br />
OTHERWISE NOTED IN THE PLANS.<br />
13. TESTING FOR ACCEPTANCE OF SANITARY SEWERS: UPON COMPLETION<br />
OF THE SANITARY SEWER SYSTEM, INCLUDING THE SERVICE LINES, ALL<br />
SEWERS WILL BE TESTED, <strong>AND</strong> WITNESSED BY THE VILLAGE, IN<br />
ACCORDANCE WITH THE PROVISIONS OF SECTION 31-1.11 OF THE<br />
"ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong>" WITH METHODS A, D, <strong>AND</strong> E TO BE USED.<br />
STORM DRAIN <strong>CONSTRUCTION</strong><br />
1. ALL STORM DRAIN <strong>CONSTRUCTION</strong> SHALL BE PERFORMED IN<br />
ACCORDANCE WITH THE ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> FOR ROAD <strong>AND</strong><br />
BRIDGE <strong>CONSTRUCTION</strong> IN ILLINOIS, AS ADOPTED JANUARY 1,1997, <strong>AND</strong><br />
REVISIONS THERETO, THE <strong>NOTES</strong> IN THE PLANS, THE SPECIAL<br />
PROVISIONS, <strong>AND</strong> THE VILLAGE REQUIREMENTS. IN CASE OF CONFLICT,<br />
VILLAGE CODE SHALL GOVERN.<br />
9
2. MANHOLES, CATCH BASINS <strong>AND</strong> INLETS: THESE ITEMS SHALL COMPLY<br />
WITH THE APPLICABLE PROVISIONS OF SECTION OF THE ST<strong>AND</strong>ARD<br />
ILLINOIS DEPARTMENT OF TRANSPORTATION <strong>SPECIFICATIONS</strong> <strong>AND</strong> IN<br />
ACCORDANCE WITH THE DETAILS CONTAINED IN THESE ITEMS.<br />
3. NO MORE THAN 12" OF ADJUSTING RINGS SHALL BE PERMITTED ON<br />
MANHOLE, CATCH BASIN <strong>AND</strong> INLET STRUCTURES, <strong>AND</strong> NO MORE THAN<br />
ONE 2" ADJUSTING RING.<br />
4. UNLESS OTHERWISE INDICATED IN THE PLANS, STORM DRAIN PIPE 12" IN<br />
DIAMETER <strong>AND</strong> LARGER SHALL BE REINFORCED CONCRETE PIPE, CLASS<br />
III, CONFORMING TO ASTM DESIGNATION C-76. 10" STORM DRAIN SHALL<br />
BE REINFORCED CONCRETE PIPE, CLASS V.<br />
5. ALL STORM DRAINS THAT FALL WITHIN PAVED AREAS SHALL BE<br />
BACKFILLED WITH GRANULAR TRENCH BACKFILL ACCORDING TO ILLINOIS<br />
DEPARTMENT OF TRANSPORTATION <strong>SPECIFICATIONS</strong>.<br />
6. ALL FIELD TILE ENCOUNTERED DURING <strong>CONSTRUCTION</strong> OPERATIONS<br />
SHALL BE CONNECTED TO THE PROPOSED STORM SEWER SYSTEM OR<br />
EXTENDED TO OUTLET INTO A PROPOSED DRAINAGE WAY. IF THIS<br />
CANNOT BE ACCOMPLISHED, THEN IT SHALL BE REPAIRED WITH NEW<br />
PIPE OF SIMILAR SIZE <strong>AND</strong> MATERIAL TO THE ORIGINAL LINE <strong>AND</strong> PUT IN<br />
ACCEPTABLE OPERATING CONDITION. A RECORD OF THE LOCATION OF<br />
ALL FIELD TILE OR DRAIN PIPE ENCOUNTERED SHALL BE KEPT BY THE<br />
CONTRACTOR <strong>AND</strong> TURNED OVER TO THE ENGINEER UPON COMPLETION<br />
OF THE PROJECT.<br />
SEDIMENTATION <strong>AND</strong> EROSION CONTROL<br />
1. ALL SEDIMENTATION <strong>AND</strong> EROSION CONTROL MEASURES MUST COMPLY<br />
WITH THE LATEST EDITION OF THE DUPAGE COUNTYWIDE STORMWATER<br />
ORDINANCE AS ADOPTED BY THE VILLAGE.<br />
SITE GRADING <strong>AND</strong> ROADWAY<br />
1. ALL SITE WORK, GRADING, <strong>AND</strong> PAVING OPERATIONS, <strong>AND</strong> ALL ROADWAY<br />
<strong>AND</strong> STREET <strong>CONSTRUCTION</strong> WITHIN THE LIMITS OF THIS PROJECT SHALL<br />
BE DONE IN ACCORDANCE WITH THE ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> FOR<br />
ROAD <strong>AND</strong> BRIDGE <strong>CONSTRUCTION</strong> IN ILLINOIS, AS ADOPTED JANUARY 1,<br />
1997 <strong>AND</strong> ALL REVISIONS THERETO, WITH THE "SPECIAL PROVISIONS" <strong>AND</strong><br />
WITH THESE <strong>CONSTRUCTION</strong> <strong>NOTES</strong> <strong>AND</strong> IN ACCORDANCE WITH VILLAGE<br />
CODE. IN CASE OF CONFLICT, VILLAGE CODE SHALL GOVERN.<br />
2. EARTH EXCAVATION SHALL INCLUDE CLEARING, STRIPPING, <strong>AND</strong><br />
STOCKPILING TOPSOIL, REMOVING UNSUITABLE MATERIALS, THE<br />
10
<strong>CONSTRUCTION</strong> OF EMBANKMENTS, NON-STRUCTURAL FILLS, FINAL<br />
SHAPING <strong>AND</strong> TRIMMING TO THE LINES, GRADES, <strong>AND</strong> CROSS SECTIONS<br />
SHOWN ON THE PLANS. THIS WORK SHALL BE PERFORMED IN<br />
ACCORDANCE WITH APPLICABLE PROVISIONS OF SECTION 200 OF THE<br />
ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong>. ALL UNSUITABLE OR EXCESS MATERIAL<br />
SHALL BE DISPOSED OF ON LOW AREAS OF THE SITE SHOWN ON THE<br />
PLANS OR AS DIRECTED BY THE PROJECT ENGINEER IN THE FIELD.<br />
3. TOPSOIL EXCAVATED SHALL BE STOCKPILED ON THE SITE IN AREAS<br />
DESIGNATED BY THE PROJECT ENGINEER UNTIL SUCH TIME THAT THIS<br />
TOPSOIL CAN BE USED FOR FINAL GRADING.<br />
4. THE SOILS INVESTIGATION REPORT FOR THE SITE <strong>AND</strong> ALL ADDENDA<br />
THERETO ARE SUPPORTING DOCUMENTS TO THE PERMIT FOR THE<br />
PROJECT. THE RECOMMENDATIONS AS STATED IN SAID REPORT ARE<br />
HEREBY INCORPORATED INTO THESE <strong>CONSTRUCTION</strong> <strong>NOTES</strong> BY<br />
REFERENCE <strong>AND</strong> SHALL BE FOLLOWED BY ALL CONTRACTORS. THE<br />
GRADING OPERATIONS ARE TO BE CLOSELY SUPERVISED <strong>AND</strong><br />
INSPECTED, PARTICULARLY DURING THE REMOVAL OF UNSUITABLE<br />
MATERIAL <strong>AND</strong> THE <strong>CONSTRUCTION</strong> OF EMBANKMENTS OR BUILDING<br />
PADS, BY THE SOILS ENGINEER OR HIS REPRESENTATIVE. FURTHER<br />
<strong>CONSTRUCTION</strong> OPERATIONS WILL NOT BE PERMITTED UNTIL THE SOILS<br />
ENGINEER ISSUES A WRITTEN STATEMENT THAT THE AREA IN QUESTION<br />
HAS BEEN SATISFACTORILY PREPARED <strong>AND</strong> IS READY FOR<br />
<strong>CONSTRUCTION</strong>.<br />
5. ALL TESTING, INSPECTION <strong>AND</strong> SUPERVISION OF SOIL QUALITY,<br />
UNSUITABLE SOIL REMOVAL <strong>AND</strong> ITS REPLACEMENT <strong>AND</strong> OTHER SOILS<br />
RELATED OPERATIONS SHALL BE ENTIRELY THE RESPONSIBILITY OF THE<br />
OWNER.<br />
6. THE CONTRACTOR SHALL USE CARE IN GRADING NEAR TREES, SHRUBS,<br />
<strong>AND</strong> BUSHES WHICH ARE NOT TO BE REMOVED SO AS NOT TO CAUSE<br />
INJURY TO ROOTS OR TRUNKS.<br />
7. THE CONTRACTOR SHALL USE CARE IN GRADING OR EXCAVATING NEAR<br />
ANY <strong>AND</strong> ALL EXISTING ITEMS WHICH ARE NOT INDICATED TO BE<br />
REMOVED. ANY DAMAGE DONE TO THESE EXISTING ITEMS BY THE<br />
CONTRACTOR'S OPERATIONS SHALL BE REPAIRED BY HIM AT HIS OWN<br />
EXPENSE.<br />
8. UNSUITABLE MATERIAL ENCOUNTERED IN EXCAVATING FOR ROADWAY<br />
SUBGRADES SHALL BE REMOVED <strong>AND</strong> REPLACED WITH SUITABLE<br />
MATERIAL TO THE LIMITS APPROVED BY THE PROJECT ENGINEER.<br />
9. REMOVED DRIVEWAY PAVEMENT, SIDEWALK, CURBS, CURB <strong>AND</strong> GUTTER,<br />
SHALL BE DISPOSED OF AT LOCATIONS PROVIDED BY THE CONTRACTOR.<br />
LOCATION OF DISPOSAL AREAS SHALL BE APPROVED.<br />
11
10. STREET PAVING <strong>AND</strong> CURBS TO REMAIN SHALL BE PROTECTED FROM<br />
DAMAGE, <strong>AND</strong>, IF DAMAGED, SHALL BE REPLACED PROMPTLY TO MEET<br />
STATE <strong>AND</strong> VILLAGE, ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong> IN MATERIALS <strong>AND</strong><br />
WORKMANSHIP.<br />
11. ALL CONCRETE POURED ON PUBLIC PROPERTY SHALL BE THE TYPE<br />
SPECIFIED IN ARTICLE 1020 OF THE ST<strong>AND</strong>ARD <strong>SPECIFICATIONS</strong>.<br />
12. ALL CURBS CONSTRUCTED OVER A UTILITY TRENCH SHALL BE<br />
REINFORCED WITH 2 - #4 REBARS FOR A LENGTH OF 20' CENTERED OVER<br />
TRENCH. SIDEWALKS SHALL BE TREATED IN THE SAME MANNER USING 3<br />
- #6 REBARS.<br />
13. THE GRADING <strong>AND</strong> <strong>CONSTRUCTION</strong> OF THE STREET IMPROVEMENTS<br />
SHALL NOT CAUSE PONDING OF STORM WATER. ALL AREAS ADJACENT<br />
TO THESE IMPROVEMENTS SHALL BE GRADED TO ALLOW POSITIVE<br />
DRAINAGE.<br />
14. THE SLOPE OF A DRIVEWAY APPROACH SHALL NOT EXCEED TEN<br />
PERCENT (10%). DRIVEWAYS SHALL BE CONSTRUCTED SO AS NOT TO<br />
IMPEDE THE SURFACE DRAINAGE SYSTEM.<br />
15. TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE TO THE ILLINOIS<br />
DEPARTMENT OF TRANSPORTATION. ST<strong>AND</strong>ARDS SHALL BE INSTALLED<br />
<strong>AND</strong> PROVIDED WHENEVER <strong>CONSTRUCTION</strong> FOR UTILITIES ARE WITHIN<br />
STREET AREAS. ALSO, ORDINANCES OF THE CITY, COUNTY OR STATE<br />
SHALL GOVERN THE TRAFFIC CONTROL.<br />
16. STREET LIGHTS OF THE TYPE SPECIFIED SHALL BE INSTALLED WHERE<br />
INDICATED ON THE PLANS. ALL STREET LIGHTING INCLUDING<br />
UNDERGROUND SERVICE CABLE, MATERIALS, EQUIPMENT, <strong>AND</strong> METHODS<br />
SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE VILLAGE<br />
<strong>SPECIFICATIONS</strong> <strong>AND</strong> THE SPECIAL PROVISIONS.<br />
17. ALL ROAD SIGNS, STREET SIGNS <strong>AND</strong> TRAFFIC SIGNS WHICH NEED TO BE<br />
RELOCATED OR MOVED DUE TO <strong>CONSTRUCTION</strong> SHALL BE TAKEN DOWN<br />
<strong>AND</strong> STORED BY THE CONTRACTOR. EXCEPT THOSE WHICH THE<br />
PROJECT ENGINEER SHALL DEEM NECESSARY FOR PROPER TRAFFIC<br />
CONTROL, WHICH SHALL BE TEMPORARILY RESET UNTIL COMPLETION OF<br />
<strong>CONSTRUCTION</strong> OPERATIONS. AFTER COMPLETION OF THE WORK THE<br />
CONTRACTOR SHALL RESET ALL SAID SIGNS.<br />
18. ALL EXISTING SIGNS <strong>AND</strong> LIGHT ST<strong>AND</strong>ARDS WHICH INTERFERE WITH<br />
<strong>CONSTRUCTION</strong> OPERATIONS <strong>AND</strong> NOT NOTED FOR REMOVAL <strong>AND</strong><br />
DISPOSAL SHALL BE REMOVED <strong>AND</strong> RESET BY THE CONTRACTOR. ANY<br />
DAMAGE TO THESE ITEMS SHALL BE REPAIRED BY THE CONTRACTOR AT<br />
HIS OWN EXPENSE.<br />
12